BestDone
Greater Boston

Bathroom remodeling that’s built to last.

New tub or shower, wall and floor tile, vanity, lighting and fixtures, with proper waterproofing and a clear written scope and price.

Bathroom remodel conceptConcept
What’s included

The full scope, handled.

  • Full demolition and disposal
  • Waterproofing and subfloor preparation
  • Tub or shower installation
  • Wall and floor tile installation
  • Vanity, sink, mirror and lighting installation
  • Trim, paint and a final clean
Typical labor ranges
ScopeLabor
Refresh
Vanity, fixtures, paint, lighting
$3,500 – $5,500
Full remodel
Down to the studs: tub/shower, tile, vanity
$7,000 – $10,500
Premium
Custom tile, glass shower, upgraded finishes
$11,000 – $16,500

Standard-size room, labor and installation only. Materials are separate and depend on your selections. Ranges are general guidance, not a quote. Your written estimate is based on a visit.

The transformation

Drag to compare.

Bathroom after Bathroom before BeforeAfter
BathroomDesign concept illustration. Not a photo of a completed project.
Questions

Bathroom remodeling FAQ

How long does a bathroom remodel take?

Often two to four weeks for a full remodel, depending on scope and how quickly materials arrive.

Can I supply my own tile and fixtures?

Yes. We price labor-only and help you calculate quantities, including overage for cuts.

What if you find water damage or mold?

We stop, show you, and give you options and a written change estimate before continuing. We recommend setting aside 10–15% for unknowns in older homes.

Next step

Free estimate for your bathroom.

Tell us a little about the project. We’ll call to schedule a visit.

Get your free estimate

We’ll call you to set a time.

Free estimate. No obligation. By submitting you agree BestDone may call you about your request. See our privacy policy.

CallText