Kitchen remodeling, planned before it’s built.
From a counter-and-backsplash refresh to a full rebuild: cabinets, counters, tile, flooring and lighting, with a clear written scope and price.
The full scope, handled.
- Demolition and haul-away of old cabinets, counters and flooring
- Cabinet installation, leveling and hardware
- Countertop templating coordination and install
- Tile backsplash and floor tile or flooring installation
- Lighting and finishing details
- Daily clean-up and a final walkthrough
| Scope | Labor |
|---|---|
| Refresh Counters, backsplash, hardware, paint | $5,000 – $8,000 |
| Full remodel New cabinets, counters, backsplash, flooring | $11,000 – $17,000 |
| Premium Custom cabinetry, stone, upgraded finishes | $18,000 – $28,000 |
Standard-size room, labor and installation only. Materials are separate and depend on your selections. Ranges are general guidance, not a quote. Your written estimate is based on a visit.
Drag to compare.
Kitchen remodeling FAQ
How long does a kitchen remodel take?
Typically several weeks, driven mostly by cabinet and countertop lead times. We give you a realistic schedule in the written estimate.
Can I keep my current layout to save money?
Yes. Keeping the layout avoids moving plumbing, gas and electrical, which is usually the biggest cost saver.
Will I be without a kitchen?
For part of the project, yes. We help you plan a temporary setup so daily life stays manageable.
Free estimate for your kitchen.
Tell us a little about the project. We’ll call to schedule a visit.
Get your free estimate
We’ll call you to set a time.